U.S. 20 to close at Kennedy Avenue starting Nov. 30 for a bridge replacement lasting through fall 2027
INDOT's contractor will close U.S. 20 between Indianapolis Boulevard and Cline Avenue for the Kennedy Avenue bridge replacement, with a detour via Cline Avenue, Chicago Avenue and Indianapolis Boulevard.
Drivers in Lake County should plan for a long closure on U.S. 20 starting on or after Monday, Nov. 30, the Indiana Department of Transportation says.
INDOT contractor Superior Construction Co. Inc. will close U.S. 20 between Indianapolis Boulevard and State Road 912/Cline Avenue for a bridge replacement project over Kennedy Avenue. The closure is expected to last through fall of 2027.
The official detour follows State Road 912/Cline Avenue, State Road 312/Chicago Avenue and U.S. 20/Indianapolis Boulevard.
Kennedy Avenue itself stays open under the bridge but will be reduced to one lane in each direction, with lane shifts around the work zone. There will be no access between Kennedy Avenue and U.S. 20 during the project.
INDOT is asking drivers to allow extra time through the area, follow traffic directions, and slow down and drive distraction-free through the work zone.